Westbrook Weir Modelling and Outline Design
Environment Agency
- Value
- £81,663
- Currency
- GBP
- Region
- UK wide
- Category
- Environment & Waste
- Procedure / notice type
- award
- Published
- 6 Oct 2025
- Closing date
- 12 Sept 2025
- Contract ends
- 30 Mar 2026
- Current supplier
- WSP UK Limited
Overview
The Environment Agency is seeking to appoint a Contractor to undertake flood risk modelling and outline designs relating to Westbrook Mill weir on the River Wey (SU9666944205) and its proposed removal. Site Background Westbrook mill has been present for approximately 300 years, and numerous weirs and control structures have been in place maintaining a head of water for its operation. The mill and associated factory have been closed for decades and there is negligible heritage value associated with the site. The weir at Westbrook Mill consists of six 1.5m wide sluice gates in steel frames. There is a difference of 1.3m between the upstream and downstream bed levels, and a maintained upstream water level 1.6m above the weir sill of 36.3m AOD. The side walls downstream of the weir are cast concrete and there is a cast concrete central pier which extends 15m downstream under the road bridge giving access to the complex car park. An access walkway is present over the weir, and the weir is manually operated. The cast concrete 'troughs' formed by the walls and the central island also have a cast concrete bed slab set at approximately 36.2m AOD which functions as a second, shallow weir at low water level conditions. Upstream of the weir the channel is confined between steel sheet pile walls with concrete capping beams for approximately 50m. There are three overspill weirs upstream that feed the Hell Ditch (SU9582944564, SU9630344350, SU9655644244), which rejoins the main river approximately 3km downstream. There is also an informal breach which introduces additional flow into the Hell Ditch (roughly SU9649544320). In 2016, the Environment Agency installed a brush-furnished fish pass at the most-upstream overspill weir, allowing the Hell Ditch to function as a fish migration route bypassing Catteshall and Westbrook weirs on the main River Wey.
Looking for work in this area? Create a free worker profile
Contract information is aggregated from public sources under the Open Government Licence and may be incomplete or out of date. Always verify details against the official published notice before bidding.
Analysis tools
What you can run here depends on your plan. Free accounts get a taster, Pro and Business unlock the full set.
Match score
See how well this contract fits your company profile, scored 0 to 100 with a plain-English breakdown. Included with Pro and Business.
Create an accountTender X-Ray
A plain-English breakdown of this notice: what the buyer wants, the evaluation criteria and weightings, what you must prove, and what could disqualify you.
Analyse any tender free: create an accountHow you'll be scored
The buyer's scoring criteria and weightings for this notice, how well your profile covers each one, and which weighted gaps to close first. Included with Pro and Business.
Create an accountBid Co-Pilot
Paste a bid question and the Co-Pilot drafts an answer from your own company profile and Answer Library, scores it against the criterion, and lists the evidence you still need. It never invents clients, figures or certifications. Included with Pro and Business, with a monthly allowance.
Create an accountHave the full tender pack? Open the bid workspace to read the pack, check the gates and answer every question.
Should I bid?
A clear BID / CONSIDER / DO NOT BID verdict for this notice, with the reasons behind it. Included with Pro and Business.
Create an accountBid Pack for this contract
Get Bid Pack (£349)
An auto-generated draft bid document for this notice: a response to the stated requirements, a Social Value statement, a Modern Slavery policy statement, and an SQ-style company overview.
This is a strong starting draft, generated automatically from your inputs and the published notice. It is not a guaranteed winning submission. You are responsible for reviewing, finalising, and checking it against the buyer's full requirements before you submit.
One-off payment. Your draft is generated as soon as your payment is confirmed.
An automated first draft, not a guaranteed win. You are responsible for reviewing and finalising it.
Original government notice
Create a free account to view the original government notice.
Contains public sector information licensed under the Open Government Licence v3.0. 123 Tenders is not affiliated with, endorsed by, or acting on behalf of any buyer organisation named in these notices, and gives no guarantee as to accuracy or outcome.
