Refurbishment and Upgrade of Calf of Eday Lighthouse

Northern Lighthouse Board

Value
£303,640 to £396,000
Currency
GBP
Region
Scotland
Category
Construction & Infrastructure
Procedure / notice type
award,contract
Published
13 Mar 2026
Closing date
Not stated
Contract ends
4 Sept 2026
Current supplier
Accted Limited

Overview

Description of Works The Site Location: Calf of Eday Minor Light is situated on the small island of Eday, to the Northeast of mainland Orkney (Latitude 59o 14.2’ N, Longitude 2o 45.7’ W). Lighthouse Site: Access to the site is through an agreed right of access with the owner of Carrick Farm, Eday. This consists of a rough footpath through grazing fields (pasture and rough grazing), approx. 870m in length. The topography is relatively flat, with some sections of steeper ground across small burns. There are steep cliffs immediately to the seaward side of the access track. On the landward side of the site, there is a small solar array bounded by a post and wire fence, and a set of concrete steps with galvanised steel handrail down to the lighthouse access walkway. This walkway itself is formed of galvanised steel which sits on stone piers. The lighthouse itself is built on a concrete base within the intertidal zone and sits approximately 18.0m out from high tide level. This project is to refurbish the lighthouse structure including replacement of the existing access ladder, balcony and lightroom with GRP equivalent, and full electrical re-work. There are minor repairs required to the existing access walkway and solar array. Site Access Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Ship and Helicopter. See sections of NLB Helicopter manual for details of working with the helicopter included as an Appendix to the tender documents. There will additionally be a requirement to bring some sections of the new lightroom to site using a ‘multicat’ style low draught vessel with crane attachment. The site can be accessed by boat, subject to local weather conditions, and on foot, as above. An agreement may be reached with the landowner regarding access through their fields using small ATVs, but this is not currently in place. The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract. All materials for site establishment to be delivered to NLB Oban no later than 17 April 2026. NLV Pharos and NLB Helicopter to deliver materials to site starting 28 April 2026, with block ending 3 May 2026, latest. A mid-visit by NLV Pharos and NLB Helicopter is scheduled for 28-30 June 2026, inclusive. Project works to be completed ahead of scheduled clearance by NLV Pharos and NLB Helicopter 29 August to 1 September 2026, inclusive. Main elements of project as follows: •Carry out full asbestos survey of buildings where work will take place •Delivery of all plant/materials to site, and establish site •Establishment of site camp, to include welfare and accommodation for site staff for duration of the project •Erection of scaffolding or other suitable access to allow for works to existing lightroom •Demolition and removal from site of existing lightroom, balcony and access ladder •Template made of existing fixing holes in top of octagonal tower section •Fabrication, delivery to site (using multicat vessel or other suitable means) and install of new GRP lightroom, aluminium balcony and access ladder •Full electrical strip, including optic and solar panels, and install of new system •Full internal and external redecoration of the tower, including removal of lightning conductor system •Works to upgrade access bridge, including replacement of cross beams where corroded, infill of voids on masonry piers and replacement of some handrail elements •Rewire of solar array boundary fence •Demobilisation Programme All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 28 April 2026. We req

Looking for work in this area? Create a free worker profile

Contract information is aggregated from public sources under the Open Government Licence and may be incomplete or out of date. Always verify details against the official published notice before bidding.

Analysis tools

What you can run here depends on your plan. Free accounts get a taster, Pro and Business unlock the full set.

Match score

See how well this contract fits your company profile, scored 0 to 100 with a plain-English breakdown. Included with Pro and Business.

Create an account

Tender X-Ray

A plain-English breakdown of this notice: what the buyer wants, the evaluation criteria and weightings, what you must prove, and what could disqualify you.

Analyse any tender free: create an account

How you'll be scored

The buyer's scoring criteria and weightings for this notice, how well your profile covers each one, and which weighted gaps to close first. Included with Pro and Business.

Create an account

Bid Co-Pilot

Paste a bid question and the Co-Pilot drafts an answer from your own company profile and Answer Library, scores it against the criterion, and lists the evidence you still need. It never invents clients, figures or certifications. Included with Pro and Business, with a monthly allowance.

Create an account

Have the full tender pack? Open the bid workspace to read the pack, check the gates and answer every question.

Should I bid?

A clear BID / CONSIDER / DO NOT BID verdict for this notice, with the reasons behind it. Included with Pro and Business.

Create an account

Bid Pack for this contract

One-off · £349

Get Bid Pack (£349)

An auto-generated draft bid document for this notice: a response to the stated requirements, a Social Value statement, a Modern Slavery policy statement, and an SQ-style company overview.

This is a strong starting draft, generated automatically from your inputs and the published notice. It is not a guaranteed winning submission. You are responsible for reviewing, finalising, and checking it against the buyer's full requirements before you submit.

One-off payment. Your draft is generated as soon as your payment is confirmed.

An automated first draft, not a guaranteed win. You are responsible for reviewing and finalising it.

Original government notice

Create a free account to view the original government notice.

Contains public sector information licensed under the Open Government Licence v3.0. 123 Tenders is not affiliated with, endorsed by, or acting on behalf of any buyer organisation named in these notices, and gives no guarantee as to accuracy or outcome.