← Back to Browse Contracts
Construction & InfrastructureEast of EnglandSource: Contracts Finder

NHDC01133773

NORTH HERTFORDSHIRE DISTRICT COUNCIL

Value
£76,328 to £1,519,892
Currency
GBP
Region
East of England
Category
Construction & Infrastructure
Procedure / notice type
award
Published
25 Aug 2026
Closing date
18 Aug 2026

Get free alerts for contracts like this

Construction & InfrastructureEast of England

Overview

This public sector decarbonisation project is split over the following two sites in North Hertfordshire: • Hitchin Town Hall and North Herts Museum, Brand St, Hitchin SG5 1HX • North Herts Leisure Centre, Baldock Rd, Letchworth Garden City SG6 2ER Hitchin Town Hall and North Herts Museum The project is to provide improvement to Hitchin Town Hall and North Herts Museum with particular emphasis on the reduction of energy and carbon use in its operation. Funding for the decarbonisation works is partly being provided via the Salix Public Sector Decarbonisation Grant Scheme to support the North Herts Council commitment to Net Zero operations by 2030. In order to provide improvements in the energy use of the building, the following works are proposed: • Installation of new secondary glazing within the window reveals of existing windows. • Installation of insulation within the rood void above the Main Hall of the Town Hall. • Installation of new Photovoltaic (PV) panels on the main roof of the Museum building. • Installation of new PV panels to the eastern face of the roof of the education room of the Museum. • Replace the existing gas fired plant with air source heat pump technology & modify existing heating systems accordingly. • Replacement of existing Air Handling equipment within Town Hall and museum building. Replacement Chiller Works at Hitchin Town Hall and North Herts Museum In addition, the following works are proposed at Hitchin Town Hall: • Replacement chiller with expanded capacity. • Multi-split DX system for the education centre and the office on the museum side of the building. • A cooling coil for the main hall Air Handing Unit (AHU4). • Installation of air conditioning to Lucas room and 1st floor office. North Herts Leisure Centre The project is to provide reduction of energy and carbon us in the operation of the Learner Pool at North Herts Leisure Centre. Funding for the decarbonisation works is partly being provided via the Salix Public Sector Decarbonisation Grant Scheme to support the North Herts Council commitment to Net Zero operations by 2030. In order to provide improvements in the energy use of the building, the following works are proposed: • Replace the existing gas fired boiler plant with air source heat pump technology & modify existing heating systems for the Learner Pool. • Provide an enclosure for the ASHP units to minimise visual impact and noise for visitors and neighbours of the site. • Provide screening planting to minimise the visual impact of the fencing around the ASHP units. The Hitchin Town Hall and North Herts Museum and North Herts Leisure Centre will be delivering under a single JCT Design & Build contract. Please note that the replacement chiller works will be delivered under a separate JCT Design & Build contact.

Looking for work in this area? Create a free worker profile

Contract information is aggregated from public sources under the Open Government Licence and may be incomplete or out of date. Always verify details against the official published notice before bidding.

More on this contract

Plain English summary

Who won last time

Renewal date

Write my bid

£1 for your first 7 days, then £89 a month. Cancel anytime.

The full price starts on 1 December 2026.

Bid Pack for this contract

One-off · £349

Get Bid Pack (£349)

An auto-generated draft bid document for this notice: a response to the stated requirements, a Social Value statement, a Modern Slavery policy statement, and an SQ-style company overview.

This is a strong starting draft, generated automatically from your inputs and the published notice. It is not a guaranteed winning submission. You are responsible for reviewing, finalising, and checking it against the buyer's full requirements before you submit.

One-off payment. Your draft is generated as soon as your payment is confirmed.

An automated first draft, not a guaranteed win. You are responsible for reviewing and finalising it.

Similar open contracts

Original government notice

Sign up or log in to view the original government notice.

Contains public sector information licensed under the Open Government Licence v3.0. 123 Tenders is not affiliated with, endorsed by, or acting on behalf of any buyer organisation named in these notices, and gives no guarantee as to accuracy or outcome.