← Back to Browse Contracts
Construction & InfrastructureLondonSource: Find a Tender

Guildhall Mechanical CWP Design - 3 lots

The Mayor and Commonalty and Citizens of the City of London

Value
£95,878 to £464,983
Currency
GBP
Region
London
Category
Construction & Infrastructure
Procedure / notice type
award,contract
Published
28 Jan 2026
Closing date
Not stated
Contract ends
30 May 2029

Get free alerts for contracts like this

Construction & InfrastructureLondon

Overview

Please note the assessment summaries were initially sent out on 28/11/2025, however, due to an administrative error, they are being re-issued to bidders on 28/01/26 to ensure alignment with the publication of this UK6 Contract Award Notice. Therefore, the standstill period will commence 28/01/26. Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: North Wing & 65 Basinghall/GJR; East Wing; West Wing. This will result in design and project management of the cyclical works projects across the Guildhall. This tendering exercise is being undertaken using the electronic tendering system ‘City of London Corporation Sourcing & Contracts Portal’ (https://cityoflondon.ukp.app.jaggaer.com/). Suppliers will need to register an interest on the system in order to participate and registration is free. The estimated contract value given at sections 31 and 32 is for the full duration of the contract including the maximum possible extensions. The estimated annual contract value is therefore Lot 1 - £200,000.00, Lot 2 - £200,000.00 and Lot 3 - £400,000.00). The Consultant for each lot is to provide professional services as defined in the respective applicable part of Section 3 Lot 1, 2 or 3 of this brief. The lots will be split according the following principles: a. Lot 1 - North Wing & 65 Basinghall Street: i. Generally the North Wing mechanical services are relatively modern, with plant maintained and upgraded since 2007 inter alia main AHUs upgraded in 2020, along with heating and BEMS upgrades between 2020 and 2024. ii. Perimeter heating systems still require some control refinement. FCUs across the North Wing are due for replacement. iii. Some design work has taken place to reduce cold spots. iv. Heating pipework has had some remedial work taking place due to leaks developing on galvanised steel pipework and fittings. v. Kitchen ventilation systems are due to be upgraded, which could realise energy savings and potentially rationalise the hydraulic arrangement with regards to air flows and interlocks. vi. Domestic Hot Water Systems are to be replaced following capacity assessment along with shower valves in the Lower Ground Floor. vii. The steam humidification system serving the main office was decommissioned some years ago. A design to reinstate a humidification system to the vent is to be provided, ideally retaining the existing AHU chassis, as these are not due for replacement. viii. Overall, the plant replacement strategy has been to upgrade BEMS and now due to follow with emitters and make improvements along the way. ix. Chillers and pumps have been replaced as part of a major works project, which is currently on-site. x. 65 Basinghall Street is also known as Guildhall Justice Rooms or GJR. xi. The old main CER room is located here and fed from the same chiller as the office area. xii. The chiller is to be decommissioned, a replacement service is to be designed and provided. The CER xiii. The FCUs serving GJR are noted as being difficult to service and have 3P valves which create a by-pass which adversely affects return temperatures back to Citigen. b. Lot 2 – Guildhall Yard East (GYE) i. There is currently a BEMS replacement project in pre-start phase with Sykes & Son on D&B contract. ii. The Private part of the building is demised to the City Of London Police. There is a major refurbishment planned for this part of the building, which is currently in the design phase. iii. Mechanical emitters are due for replacement across the Public side of the building. iv. Pumps serving both Public and Private areas have recently been replaced. v. AHUs serving the Public areas were upgraded in 2021 along with the BEMS that controls them. vi. The general replacement/upgrade strategy for systems excluding the AHUs, is to replace and upgrade the emitters following on from the BEMS works. c. Lot 3 – West Wing i. Mechanical systems are beyond end of working life and controlling the environment is

Looking for work in this area? Create a free worker profile

Contract information is aggregated from public sources under the Open Government Licence and may be incomplete or out of date. Always verify details against the official published notice before bidding.

Analysis tools

What you can run here depends on your plan. Free accounts get a taster, Pro and Business unlock the full set.

Match score

See how well this contract fits your company profile, scored 0 to 100 with a plain-English breakdown. Included with Pro and Business.

Create an account

Tender X-Ray

A plain-English breakdown of this notice: what the buyer wants, the evaluation criteria and weightings, what you must prove, and what could disqualify you.

Analyse any tender free: create an account

How you'll be scored

The buyer's scoring criteria and weightings for this notice, how well your profile covers each one, and which weighted gaps to close first. Included with Pro and Business.

Create an account

Bid Co-Pilot

Paste a bid question and the Co-Pilot drafts an answer from your own company profile and Answer Library, scores it against the criterion, and lists the evidence you still need. It never invents clients, figures or certifications. Included with Pro and Business, with a monthly allowance.

Create an account

Have the full tender pack? Open the bid workspace to read the pack, check the gates and answer every question.

Should I bid?

A clear BID / CONSIDER / DO NOT BID verdict for this notice, with the reasons behind it. Included with Pro and Business.

Create an account

Bid Pack for this contract

One-off · £349

Get Bid Pack (£349)

An auto-generated draft bid document for this notice: a response to the stated requirements, a Social Value statement, a Modern Slavery policy statement, and an SQ-style company overview.

This is a strong starting draft, generated automatically from your inputs and the published notice. It is not a guaranteed winning submission. You are responsible for reviewing, finalising, and checking it against the buyer's full requirements before you submit.

One-off payment. Your draft is generated as soon as your payment is confirmed.

An automated first draft, not a guaranteed win. You are responsible for reviewing and finalising it.

Similar open contracts

Original government notice

Create a free account to view the original government notice.

Contains public sector information licensed under the Open Government Licence v3.0. 123 Tenders is not affiliated with, endorsed by, or acting on behalf of any buyer organisation named in these notices, and gives no guarantee as to accuracy or outcome.